Conveyor Operation

10.19 A 300 ft long roller conveyor, which operates at a velocity = 80 ft/min, is used to move pallets between load and unload stations. Each pallet carries 12 parts. Cycle time to load a pallet is 15 sec and one worker at the load station is able to load pallets at the rate of 4 per min. It takes 12 sec to unload at the unload station. Determine (a) center-to-center distance between pallets, (b) the number of pallets on the conveyor at one time, and (c) hourly flow rate of parts. (d) By how much must conveyor speed be increased to increase flow rate by 3000 parts/hour.

“Struggling with a similar assignment?”

Place an order below and we’ll get it done within the deadline selected.

20% OFF on your first order

Day(s)

:

Hour(s)

:

Minute(s)

:

Second(s)

Let’s Get Started

Team with top experts around the globe to succeed in learning

 

How it works

If you are looking for the best essay writing services for cheap, then you have come to the right place. Essaytab.com specializes in custom academic papers for all levels of students. From high school students to college graduates and undergraduates, all the way up to university students at master’s degree and even doctoral levels.

Place an order

Fill out the order form. Attach any custom instructions.

Make Payment

Pay online safely with major platforms.

Writing Process

We’ll assign your paper to the most suitable writer & editor.

Get your Order

Once complete, we’ll send the paper to your email.